I’m just starting out and finished the last of the installs today.
5 Vue 2 units Monitoring 55 Circuits (25x120v, 15x240v)
I still have two more 100A and a 70A Panel I’d like to monitor, but will start here.
Main Meter Panel with Flex CTs on the MAIN

House Panel A

House Panel B
Pump House Panel (Wells and Water & Car Charger)

Master bath Sub Panel (Radiant Floor Heat, Steam Generator, Lights, Towel Bars, recepts)
