Install with 7kW solar and 200 amp main panel feeding two sub panels.

Emporia Energy Community Share Your Emporia Experience Install with 7kW solar and 200 amp main panel feeding two sub panels.

Viewing 0 reply threads
  • Author
    Posts
    • #5931 Report Abuse

      FarceBook

      Put mains CTs ahead of meter due to cramped busbars.
      Also ordered 2 oversize expansion CTs due to heavier gauge wires.
      Solar on inputs 7 & 8 (see red and black wires spliced on to left two breakers (ganged).
      Haven’t figured out how to paste a photo just yet.