Emporia Community

Community Forum for Emporia

Forum Replies Created

Viewing 1 post (of 1 total)
  • Author
    Posts
  • in reply to: Monitoring two electric panels #9537 Report Abuse
    CharlesM99
    Member

    Ok thank you for the reply.

    How can the CTs be extended? It looks like they only have 1m long leads, and that’s not enough to run between the two panels.

    The second panel is fed from the first one, so with two Vue 2s I am concerned that the readings will be off because the loads in the second panel will be measured twice.

     

     

Viewing 1 post (of 1 total)