@ryanhoelzer
That certainly could work, but I’d have to rewire my branch CT(s), If I ran each VUE2 with only “A” input on one of the phases, I could use every-other breaker. I would just have to make sure on my 2-pole that I select which HOT appropriately to do the proper 2x calc. Given that the 220/240v circuits are a balanced load, that *should* work out from a math perspective.
This seems like a rather painful setup, and this is something that could easily be solved through software 🙂