I have my main line that comes into my main service panel. In this panel, I have a gen 2 Vue, with 16 circuits connected.
One of the circuits in this panel is a 100 amp double breaker, which then feeds into my generator transfer switch.
I have a second Vue in the transfer switch, with 12 circuits connected. The two 200A CT are hung on the incoming feed for the transfer switch, which is coming from the 100 amp breaker.
In Emporia app, I nested the second Vue under the first one.
Is this the correct way to set this up?