Forum Replies Created
-
AuthorPosts
-
waterboyz
MemberI had a network error. I knew my info was correct so I kept hitting (out of frustration) the retry. BINGO. It eventually connected and all is well…..for the moment.
waterboyz
MemberThanks for the quick response.
Ok, I understand better on the 220 combinings. That way I can view each leg and also view the combined legs. I also have each leg of my 220s CTd. That pretty much has my 14 of 16 CTs. Know wonder you have 2 Gen2s. I have 25 breakers to go. Since my panel is open at the bottom I was thinking of mounting the control box under the panel and run the CT wires through a knockout. Then I could place a cosmetic shield to hide everything.
- A/C – 1
- A/C – 2
- Furnace – 1
- Furnace – 2
- Furnace – 3
- Furnace – 4
- Water Heater – 1
- Water Heater – 2
- Well Pump – 1
- Well Pump – 2
- Sub-Panel – 1
- Sub-panel – 2
- Dryer – 1
- Dryer – 2
waterboyz
MemberOh look what Jim@Emporia wrote on DECEMBER 1oth 2019.
“This is the number one request that we get, but also a big undertaking. It’s a priority for us and we’re getting to it as quickly as we can. Thanks as always for your suggestions!”
I want to +1 the desktop version. I’m old. Have poor vision. Have phat phingers that are a problem on my pocket computer.
Also, can we get a LIKE button on each of the comments in a thread and not just at the beginning?
waterboyz
MemberHello Everybody,
I’m near Fredericksburg VA and just installed my Gen2 yesterday. My OCD is off the chart based on the pic.
Anyway, I was trained on vacuum tubes so I’m old. I have seen the evolution of computers since I was a service technician for many years. Everything I worked on is either in the museum or on the History Channel.
Hey JohnSKO, your electrician was way more OCD than mine was.
I’m adding a generator so have done waaay too much research so ask me anything.
A someone mentioned, I too am afraid that once these units have a large enough installed base that they will go the subscription route. I have a lot of Wyze Labs cameras and they have gone through a lot of growth and are struggling on how to cover the cloud costs.
I’m here and will continue to monitor this community. I have a spreadsheet on my breaker panel so I have some tips on that.
waterboyz
MemberSpiker,
You bring up some great points. I just installed my 16 CT yesterday.
1) I only have one VUE so not an issue for me……..yet.
2) I was just thinking about this. I have my entire panel on a spreadsheet of what EXACTLY is on what breaker. I have it in order of odd number then even numbers. I have a second sheet that lists by location order. Would be nice to have some idea of what is on the circuit.
3) I haven’t look at notifications so can’t comment on this yet.
4) I have no plans to include my Ecobee t’stat. I pretty much set it to one temp and left it alone, no ups or downs. Mine is a heat pump with a HUGE electric toaster as the back-up heat. I told my Ecobbe to never turn on the toaster unless we have been in an ice age for 21 days. I did program it to run the air handler for 5 minutes every hour to get the air somewhat balanced between the two levels that are on one system.
5) Yep, I was thinking about that as well.
6) I’m not sure what you mean there.
7) I was just going to ask them if there was a desktop app. I’m old. Have poor vision. Have phat phingers that are a problem on my pocket computer.
Trying to get all that wire in an orderly arrangement is playing havoc with my OCD.
I’m anxiously awaiting thoughts and suggestions and opnions.
-
AuthorPosts